Plant Reinforcement Products

Product Introduction

SHB-601 Inject-type anchor adhesive - Engineering reinforced is A, B two-component modified epoxy resin adhesive, using a special injection gun injection, the two components are fully mixed in the static mixer, directly injected into the hole. It has the characteristics of rapid solidification, strong anchoring force, similar to embedment, no expansion stress, good seismic performance, convenient and fast without adhesive use, anti-aging, good resistance to media (acid, alkali, salt) and so on. Passed the type inspection of GB/T 37127-2018 "Anchorage adhesive for Concrete Structure Engineering".

Product features

·Modified epoxy resin, free of styrene, safe and non-toxic.

·The solidification speed is fast, the anchoring force is strong, and the shape is similar to embedment.

·No expansion stress, good seismic performance.

·Aging resistance, good resistance to media (acid, alkali, salt), etc.

·This product is especially suitable for horizontal holes, vertical holes planting reinforcement construction.

·National A-grade glue standards, through 11 types of test reports, A total of 36 test items.


Performance parameters

Inspection item

Qualification standard

Colloidal Property

Splitting tensile strength (MPa)

≥ 8.5

 

Bending strength (MPa)

≥ 50, and shall not be cataclastic failure

Compressive strength (MPa)

≥ 60

 

Bonding Ability

Standard value of steel to steel tensile shear strength (MPa)

Standard value (23±2) ℃, (50±5) %RH

≥ 10

Average (60±2) ℃, 10min)

≥ 11

Average (-45±2) ℃, 30min)

≥ 12

Bond strength of ribbed steel bar to concrete under constrained drawing conditions (MPa)

C30 φ25 L=150mm

≥ 11

C60 φ25 L=125mm

≥ 17

Steel to steel T impact stripping length (mm)

 

≤ 25

Thermal deformation temperature (℃)

≥ 65

Non-volatile matter content (%)

≥ 99

 

Performance Index

 

Inspection item

Qualification index

Environmental resistance

Wet and heat ageing resistance ability (%)

Compared with the short-term results at room temperature, the decrease rate of shear strength ≤ 12

Heat aging resistance (%)

Compared with the short-term results at same temperature 10min, the decrease rate of shear strength : ≤ 5

Freezing and thawing resistance ability (%)

Compared with room temperature, short-term results, the shear strength decrease rate is not greater than : ≤ 5

Stress resistance ability

Resistance to fatigue stress

After 2×106 times continuous sine wave fatigue loads,specimen does not destory

Long-term stress resistance

The steel to steel tensile shear specimens does not destroy,and creep deformation value is less than 0.4mm

Dielectric resistance

Salt spray resistance (%)

Strength reduction rate compared with the control group: ≤ 5%, and no cracks or degumming

Alkaline medium resistance (%)

The strength does not decrease compared with the control group, and the concrete is damaged, and the appearance must not have cracks, peeling or foaming

Resistance to acid media (%)

The concrete is damaged, and the appearance must not be cracked or degummed

Remarks: Judgment basis: GB50728-2011 "Technical Specification for Safety Evaluation of Engineering Structural Reinforcement Materials" (Table 4.2.2-3) (Table 4.2.2-4) (Table 4.2.2-5) (Table 4.8.1)

Curing time

Ambient Temperature

()

Time of Operate

(min)

Cure Time(h)

-5

40

72

0

35

72

10

30

48

20

25

24

30

20

12

Note: When the ambient temperature is lower than -5, the curing time can be extended according to the above table.

Application scope

·Reinforcement and bolts are planted in the concrete members, and stone dry hanging supports are fixed in the curtain wall.
·Reinforcing of building structure and planting reinforcement of frame.
·All kinds of equipment foundation fixed, steel structure and concrete structure anchorage connection.
·Railways, highways, Bridges, water conservancy, reconstruction and expansion and reinforcement projects.
·Billboards, tunnel pipelines, overhead road soundproofing panels and guardrail fixation.

Testing report

Construction video images

image.png

Notes

·Thoroughly clean the drilling hole before rebar planting, and rotate the rod body into the hole. If there is no glue flowing out of the hole, the rod body must be pulled out and re-injected with glue. It is strictly forbidden to touch the rod body before curing.

· The glue in the first tube of static mixer should be discarded and not used.

· The unused glue can be cleaned out after the glue mouth, tighten the bottle cap, and continue to use next time.

· Wear gloves, masks, goggles, safety hats and other protective equipment during construction; If accidentally on the skin or clothing, use acetone and a lot of water to clean; If ingested or spilled into eyes, seek medical attention immediately.


Get a quote

// Product

Related Products.

SHB-612

SHB-612

SHB-612 injectable reinforcement adhesive (ultra-fast curing

SHB-611

SHB-611

SHB-611 Special underwater injectable muscle grafting glue

SHB-613

SHB-613

SHB-613 Injectable reinforcement glue for rail transit

SHB-601

SHB-601

SHB-601 Engineering Reinforced Injectable Reinforcement Glue

If you have questions or suggestions, please leave us a message,we will reply you as soon as we can!