SHB-A502 Carbon fiber plate
SHB-1.2T |
Thickness (mm) |
1.2 |
Width (cm) |
5/10 |
|
Length (m/ roll) |
100 |
|
SHB-1.4T |
Thickness (mm) |
1.4 |
Width (cm) |
5/10 |
|
Length (m/ roll) |
100 |
|
SHB-2.0T
|
Thickness (mm) |
2.0 |
Width (cm) |
5/10 |
|
Length (m/ roll) |
100 |
|
SHB-3.0T |
Thickness (mm) |
3.0 |
Width (cm) |
5/10 |
|
Length (m/ roll) |
100 |
·Light weight, easy operation and no need for large machinery.
·High tensile strength, several times more than ordinary steel, elastic modulus is better than steel, with excellent creep resistance, corrosion resistance and shock resistance.
·High strength, quality is only 1/5 of steel, has high toughness, can be coiled, can be supplied in a larger length without overlap.
·The change of the shape of the component is small, and the net space of the structure is not affected.
·The reinforcing effect of 1 layer of carbon fiber plate is equivalent to 4-8 layers of carbon fiber cloth.
·The construction of carbon fiber plate is convenient, without complicated operation, and the construction quality is easy to ensure.
Inspection item |
Qualification index |
Standard tensile strength (MPa) |
≥2400 |
Tensile modulus of elasticity (MPa) |
≥1.6×105 |
Elongation (%) |
≥1.6 |
Interlaminar shear strength (MPa) |
≥50 |
Positive tensile bond strength between fiber
composite and substrate - on concrete substrate (MPa) |
≥2.5,and the substrate cohesion failure |
Remarks: Judgment basis: GB50728-2011
"Technical Specification for Safety Evaluation of Engineering Structural
Reinforcement Materials" (Table 8.2.4) |
·Flexural reinforcement of concrete floors and beams.
·The wall and plate are reinforced by opening holes.
·Reinforcement of concrete wall.
·Reinforcing and strengthening of highway and railway Bridges and tunnels.
·Bridge reinforcement reinforcement.
·Reinforcement of municipal pipeline.
·Construction preparation: Positioning and laying out according to the design drawing.
·Substrate treatment: chisel off the concrete surface coating layer to be reinforced, smooth the surface, and blow the dust on the concrete surface.
·Configuration glue: According to the weight ratio A:B=3:1, mix the A.B component evenly in the packaging bucket.
·Apply glue: Evenly apply the configured glue on the surface of the carbon plate to avoid bubbles.
·Paste carbon plate: Paste the carbon plate on the concrete surface, remove the surrounding overflow glue and fix it.
·Curing: At room temperature, curing time should not be less than 24 hours.
·Gloves, masks, goggles, safety hats and other protective equipment must be equipped during construction. Pay attention to fire prevention and keep good ventilation on site.
·Please pay full attention to the possibility that the carbon plate may spring up when unwinding the rolled product.
·Carbon fiber plate has electrical conductivity, must be careful around the electrical appliances.